The latest member of our fleet. Normand Clipper was built 2001 as a Cable Laying and Repair Vessel.
The Q1400 Trenching system has the capability to perform jet trenching in soils of up to 100 KPA and mechanical chain cutting of soils of up to 250 KPA.
Pre-Lay Plough facilitates a single mode solution for single pass route clearance. Boulders are removed to the area outside the potential back fill spoil and pre-cutting of a “y” profiled trench up to 1.7m depth for post cable lay project requirements.